Last date modified: 2026-Nov-05

Importing a production load file

You can use Import/Export to import external productions, including single and multiple PDF files, into Relativity aiR with Import/Export. Import an external production when a case team needs the documents as they appeared in the production, and needs them available for searching.

References

We recommend referring to the following information when importing production load files:

Importing production load file workflow

You can import data from a production load file only into an existing production set that is in New status and contains no data sets. If no such production set exists in the workspace, you must create one before starting the import job. For more details, refer to the Production documentation. If you want to import a production consisting of produced images, natives, and extracted text, see the following Community article.

To import a production load file:

  1. Use tabs, search, or the quick nav bar to navigate to the Import/Export Job page.
  2. On the Import/Export Job page, click New Import/Export Job to start a new job.
  3. On the Choose Workflow dialog, the Import button is selected by default. Next, click the Structured (Processed) Data workflow box.
    Importing structured (processed) data
    If you activated Express Transfer, the Express Transfer section displays a status of Active. See Activating and deactivating Express Transfer for more information.
  4. On the Choose the Load File Type dialog, click the Production box to import a production load file to your workstation.
    Import Choose Load File of Production Type
  5. If Express Transfer is not Active, skip this step. If it is Active, go to Select data to Import fields.
  6. Complete fields on the Choose Load File and Location dialog, then click Continue. For more information, go to Choose Load File and Location fields. Also, refer to Import/Export load file specifications for details on load files.
  7. On the Import Settings dialog, select the production to import and choose the numbering and import mode settings. For more information, go to Import Settings fields.
  8. (Optional) Click Download Profile (.ie) on the Import Settings dialog to download the job configuration settings entered to an .ie file on your computer. This way they can be reused for other jobs.
  9. (Optional) Click Precheck Load File on the Import Settings dialog to check for errors before importing the load file. For details, see Pre-check Load File optional step.
  10. Click the Import button to start the importing process.
  11. Review the importing progress on the Overview tab on the Importing dialog. Real-time details regarding the number of transferred files and data size being processed are displayed during the Uploading and Extracting steps. If needed, click Cancel to stop the import job before it completes. Otherwise, click Close when the importing process is complete.
    If you used Import/Export in web only mode, meaning Express Transfer was not active, do not close the Importing dialog until after the Uploading step has successfully completed. Closing the dialog before the Uploading step completes terminates the data transfer (upload) process.
    Overview tab of Importing dialog
  12. Go to the Job Settings tab on the Importing dialog to review the job configuration settings. You can select Download Profile (.ie) to download the job configuration settings entered to an .ie file on your computer. This way they can be reused for other jobs.
    Job Settings tab of Importing dialog
  13. If the load file contains no errors, go to the next step. If errors were found, click the Errors tab and follow the instructions in the Errors tab on the Importing dialog.
  14. Click Finish to close the dialog.

You can review the Import/Export Job page to see more information about the job. Refer to Import/Export Job tracking and history for details.

For more information on where Import/Export saves files, see the Community article Import/Export: Where Files Are Saved By The Import/Export Application.

When a job is running using Express Transfer, you can close the Import/Export application. The transfer job continues without interruption. You can monitor the progress and history of jobs within Express Transfer. For more information, see Express Transfer Job tracking and history. You do not have to be logged in to Relativity aiR to view information within the Express Transfer application.

Select data to Import fields

Choose Load File and Location fields

Import Settings fields

Pre-check Load File optional step

You can click Precheck Load File option on the Import Settings dialog to run a validation process on the load file to check for errors before importing it. For more details, refer to Pre-check Load File.

If the workflow is configured to use Staging, the Pre-check Load File step is unavailable. Ensure your load file is validated manually before proceeding.

During precheck, Import/Export validates Image file paths. It checks 1,000 random lines across the whole load file. All detected errors are displayed in the Pre-check window. Click the down arrow next to any error message to view its details. If you want to correct the errors in the source files and repeat the importing steps, click Cancel. Otherwise, go to the next step to import the load file with errors and correct them later.

The Pre-check Load File summary dialog displays a maximum of 1,000 errors for each error category. For example, if an error category has 2,000 errors, only the first 1,000 are displayed in the drop-down list.

Precheck load file dialog

Errors tab on the Importing dialog

If the load file contains errors, click the Errors tab on the Importing dialog to view them. Next, do one of the following:

  • To proceed without correcting the errors, click Close.
  • To download the error report as a .csv file, select Errors & Warnings Report (.csv). The report lists all errors and warnings for the import job. You can download in from any tab on the Importing dialog.
  • To correct the errors manually:
    1. Select Download Error Load File.
    2. Review the errors and correct them as needed.
    3. When you have finished, upload the file with the corrected data by clicking Select on the Importing dialog next to New Load File.
    4. Navigate to the load file on your local drive to select it.
    5. Once selected, click Import to import the job with corrected data.
  • You can only correct documents included in the original load file. If you need to add missing documents, create a new import job.
  • Only records that imported without errors will appear in the workspace.

Options available on the Errors tab on the Importing dialog.

Feedback